Customization: | Available |
---|---|
Color Temperature: | 3000-6000K |
Lamp Body Material: | Aluminum Alloy |
Still deciding? Get samples of $ !
Request Sample
|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Item name | 500W IP66 LED SMD stadium light |
Power | 500 Watts |
Light Source | Lumleds SMD5050 |
LED Quantity | 196 pcs |
LED Driver | MEANWELL XLG or Inventronics driver |
Input Voltage | AC 85~305V 50/60Hz |
Color Temperature | 3000-6000K |
Light effect | 160LM/W |
Lumen | 80,000LM |
CRI | Ra.≥ 75 |
Defend grade | IP66 |
Viewing angle | 10° / 20° / 40° / Asy.50° / 60° |
Materials | ADC12 die-casting aluminum alloy |
Operating Temp. | -20ºC ~ +60ºC |
Applications | sport stadium,tunnel,park,bridge,plant, workshop, etc. |
Qty / CTN | 1PC |
G.W. | 15KG/PC |
Lamp dimensions | L630 x W240 x H350mm |
Carton size | 66 x 41 x 29cm |
Lifetime | 50,000 hours |
Quality warranty | 5 years |
Shell color | Black |
Certificates | CE,ROHS, EMC, LVD, ISO9001 |
Installation instructions:
1. Non-specialist electricians please do not repair or modify this product without authorization;
2. Please turn off the power before installation;
3. Before installation, please check whether the voltage marked on the lamp is consistent with the input voltage to be connected;
4. In order to ensure the service life of the product, please do not use it in a place with strong acid mist;
5. Pay attention to shock protection during installation and transportation;
6. Before installation, ensure that the installation position can withstand 10 times the weight of the product, and install it in a flat place without vibration, no swing, no fire hazard;
7. If the lamp fails, please place the lamp in one place and send it back to the company for inspection and repair.
8. If the lamp body or wire is damaged, please stop using it immediately.
Our workshop:
We have 8 production lines at production department, including assembling, inspection and aging test lines.
Production ability: 10-15 working days for 100pcs LED stadium lights, and 20-25 working days for 200pcs LED stadium lights at common requirements.
Each Lamp must pass 24 hours aging test and high voltage (10KV) surge test before we make packing and make delivery.
Our Services:
1. For all your inquires about us or our products, we will reply you in detail within 24 hours;
2. Excellent design team with designers of more than 12 years experience, can offer professional advice for practical application;
3. 5000,000 pcs light source annual production capacity, the products export to EU market, American market, Russia, Kazakhstan, Australia, South Africa, Zimbabwe, Vietnam, etc;
4. Good OEM & ODM business ability, 8 production lines meet your shipping requirement;
5. Export port Shenzhen or Guangzhou;
6. Discount available for bulk order;
7. High quality component and material, 5050SMD and MW or Inventronics driver etc, depend on your needs.