Customization: | Available |
---|---|
Color Temperature: | 3000-6500K |
Lamp Body Material: | Die-Casting+Reinforced PC |
Still deciding? Get samples of US$ 128/Piece
Request Sample
|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
High power IP65 outdoor waterproof 300W flood LED tunnel light
Item name | LED module tunnel light 300W |
Power | 300W |
Light Source | Epistar SMD3030 |
Input Voltage | AC100-265V, 50-60Hz |
Color Temperature | 3000-6500K |
Light effect | 110LM/W |
Lumen | 33,000LM |
PF | ≥0.90 |
CRI | Ra.≥80 |
IP | 65 |
Viewing angle | 30° 60° 90° 70x140° |
Materials | Die-casting Aluminum + reinforced PC |
Operating Temp. | -25ºC to +45ºC |
Applications | Tunnel,park,bridge,plant, workshop,stadium, etc. |
Qty / CTN | 1PC |
N.W. | 7.8KG |
G.W. | 8.8KG |
Lamp dimensions | 530 x 330 x 280mm |
Carton size | 63 x 43 x 30cm |
Lifetime | 50,000 hours |
Quality warranty | 5 years |
Certificates | CE,ROHS, EMC, LVD, ISO9001 |
Product manual:
1.Long life, can be used for more than 10 years under normal circumstances.
2.The light is even and soft, and the brightness is high. The color rendering is good, the color of the real object is more realistic, and various light colors are available to meet the needs of different environments.
3.Quick start, no flicker, no noise,no radio frequency interference.
4.Using high efficiency constant current driver, wide voltage input, can work in places with unstable voltage.
5.Lightning protection, the lamp body is made of aluminum alloy material, high strength, corrosion resistance and weather resistance, good heat dissipation.
6.Green and environmentally friendly, using lead-free and mercury-free process.
Product manual:
Application:
Tunnel,outdoor engineering lighting, highways, trunk roads, flyovers, streets, squares, schools, residential areas, industrial area and other outdoor lighting places.
Instructions:
1. Non-specialist electricians please do not repair or modify this product without authorization;
2. Please turn off the power before installation;
3. Before installation, please check whether the voltage marked on the lamp is consistent with the input voltage to be connected;
4. In order to ensure the service life of the product, please do not use it in a place with strong acid mist;
5. Pay attention to shock protection during installation and transportation;
6. Before installation, ensure that the installation position can withstand 10 times the weight of the product, and install it in a flat place without vibration, no swing, no fire hazard;
7. If the lamp fails, please place the lamp in one place and send it back to the company for inspection and repair.
8. If the lamp body or wire is damaged, please stop using it immediately.
Our workshop:
We have 6 production lines at production department, including assembling, inspection and aging test lines.
Production ability: 3-5 days for 500pcs LED tunnel light, and 10-15 working days for 3000pcs LED tunnel lights at common requirements.
Each Lamp must pass 24 hours aging test and high voltage (6KV) surge test before we make packing and make delivery.
Our Services:
1. For all your inquires about us or our products, we will reply you in detail within 24 hours;
2. Excellent design team with designers of more than 12 years experience, can offer professional advice for practical application;
3. 5000,000 pcs light source annual production capacity, the products export to EU market, American market, Russia, Kazakhstan, Australia, South Africa, Zimbabwe, Vietnam, etc;
4. Good OEM & ODM business ability, 6 production lines meet your shipping requirement;
5. Export port Shenzhen, Hongkong or Shanghai;
6. Discount available for bulk order;7. High quality component and material, Osram, Bridgelux, 3030SMD, 5050SMD, Epistar LED chips, MW / Sosen / HT/ TUV SAA CE listed driver etc, depend on your needs.
Payment Terms:
TT Bank Transfer, support 30% deposit and 70% before delivery;
PayPal, western union, Alipay etc.
NO O/A.
Delivery time:
Samples and less than 100pcs in 3-5 working days;
500pcs in 7-8 working days;
3000pcs in 15 working days.
About Shipping:
Samples sent by DHL, TNT, Fed EX, UPS, SF Express, Aramex etc. Door to door, you may pay customs tax depends on your customs policy.
By air or by sea for bulky orders available.
FAQ:
1. Are you factory supplier?
Yes, we are manufacturer of LED lamps since 2008 and we have our own factory, supply duable super quality items and reliable after-sale service.
2. Do you supply OEM or ODM?
Yes, we can supply OEM and ODM serice with favorable price and we have our own mould workshop, your brand and logo can be printed on the items.
3. How long will it spend for our orders to be sent out?
It takes 3-5 days for samples at common requirements, and 10-15 days for big order such as 3000pcs led tunnel light.
4. What about your after-sales servie and warranty policy?
We offer 5 years warranty for this led tunnel light, by supplying you the lamp parts or new replacements for free during the warranty period for any non-human defective lamps.